Assessed

Virvolt

star star star star_border star_border
help_outline

'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Team for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
68 assessments

Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

Rendre les mobilités douces vraiment durables.

Lever of action
Sufficiency
Sector
Transport
Discover our scope of action arrow_forward
Submission date October 31, 2021 Founders Romain Buquet Development location Toulouse, France

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

Rendre le vélo électrique plus durable, réparable et accessible à tous.

How is the problem solved?

Nous transformons le parc de vélos "musculaires" en électrique, dans une logique d'économie circulaire. Notre solution low tech permet au plus grand nombre d'accéder à ce moyen de transport, trop souvent reservé aux CSP+.

What is the customer target?

Toutes les personnes travaillant à moins de 10 km de chez eux, qui pourraient faire le trajet en VAE.

How is this solution different?

Nos kits sont conçus et designés pour être ultra fiables, modulaires, faciles à réparer et accessibles à tous.